Repository logo
Andean Publishing ↗
New user? Click here to register. Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Autor "Humberto Marengo"

Filter results by typing the first few letters
Now showing 1 - 1 of 1
  • Results Per Page
  • Sort Options
  • Loading...
    Thumbnail Image
    Item type: Item ,
    Case Study: Dam Safety during Construction, Lessons of the Overtopping Diversion Works at Aguamilpa Dam
    (American Society of Civil Engineers, 2006) Humberto Marengo
    A study on risk analysis by overtopping of the diversion works of Aguamilpa Dam in Mexico was carried out to examine the overtopping event of January, 1992. Specifically, this study focuses on the upstream water surface elevation during the flood considering the tunnel discharge actual width and roughness. During this maximum flow event, the upstream cofferdam was overtopped and the discharge tunnels exceeded their maximum hydraulic capacity. The risk analysis was made considering the original hydrologic data (until 1992), the final constructed conditions, to establish a performance function that compares the risk of original deterministic analysis with a probabilistic analysis made in 1992. The study also focuses on practical improvements in the construction stage of tunnels; like lining the floor with hydraulic concrete and shotcrete in vaults and walls, that improves the safety of dams during construction and increases the real return period. The work here is presented as a case study because of the unique large-scale flow conditions that are registered in diversion works of dams.

Andean Library © 2026 · Andean Publishing

  • Accessibility settings
  • Privacy policy
  • End User Agreement
  • Send Feedback