Retratamiento de colas finales planta c-4 de la mina de catavi (Potosi-Bolivia); una propuesta técnica económica y ambiental

dc.contributor.authorZambrana Martínez, Rubén Néstor
dc.coverage.spatialBolivia
dc.date.accessioned2026-03-23T15:19:20Z
dc.date.available2026-03-23T15:19:20Z
dc.date.issued2016
dc.descriptionNo. 1
dc.description.abstractLas colas-arenas de Catavi son residuos mineros sulfurosos y actualmente la Cooperativa Multiactiva Catavi Siglo XX Ltda., realiza el retratamiento para recuperar casiterita (SnO2); la operación es mediante proceso gravimétrico en mesas vibrantes y diariamente retrata alrededor de 250 t. Producto de esta actividad se generan las colas finales que son vertidas directamente al río Catavi en forma de pulpa. Se ha determinado que las colas finales contienen: 0.20% a 0.25% de estaño, 76.4% de cuarzo (SiO2), sulfuros minerales como pirita que pueden causar contaminación, y otros. Para recuperar la casiterita de las colas finales, se han efectuado cinco pruebas metalúrgicas a nivel laboratorio: las dos primeras para establecer el mejor proceso gravimétrico, resultando la prueba concentración centrífuga, en mesa y flotación de sulfuros; y las otras tres pruebas se efectuaron con remolienda a -65#, -100# y -150# Tyler. Se recomienda la prueba metalúrgica con remolienda a -100; por dos razones, primero: se ha mejorado la recuperación del estaño de 47.67% a 67.53%, y segundo: en la etapa de flotación se ha logrado separar el 50% del azufre, que es un componente esencial de los sulfuros. También se ha determinado la presencia de Elementos Potencialmente Tóxicos: mercurio 0.09 mg/kg, cadmio <0.01%, arsénico 0.07%, antimonio 0.03%, y plomo 0.01%. Los índices metalúrgicos obtenidos alientan la propuesta de implementar una planta piloto para dos años e iniciar el retratamiento de las colas finales previa molienda a -100#. Al mismo tiempo empezar la construcción del dique de colas. Al cabo de los dos años, se propone ampliar a planta completa para 8 años más y 1200 toneladas por día. Se han obtenido los siguientes índices económico-financieros: Costo de inversión estimado: $U.S. 9'840,908.00; valor actual neto: $U.S. 667,323.17; tasa interna de retorno: 15.28%; relación B/C: 1.60; periodo de recuperación del capital: 6 años; duración del proyecto: 10 años. Los resultados, indican que es posible llevar adelante el proyecto.es
dc.description.abstractThe sand-grained tailings of Catavi, are a sulfide-rich mining waste that is currently retreated by the Cooperativa Multiactiva Catavi Siglo XX Ltda., to recover cassiterite (SnO2); the operation consists in a gravimetric process in vibrant tables and processes about 250 tons for day. The final tails product of this activity, are discharged as a pulp directly to the Catavi River. It has been determined that this material still contains: 0.20% to 0.25 % tin, 76.4% quartz (SiO2), sulfide minerals as pyrite that may cause contamination, and others. To recover cassiterite from the final tailings, we have conducted five metallurgical tests at laboratory level: the first two to establish the best gravimetric process; resulting centrifugal concentration test, table and sulphide flotation; and three tests were performed with regrinding to -65#, -100# and -150# Tyler. Test is recommended with regrind to 100; for two reasons, first: it was improved recovery of 47.67% tin to 67.53%, and second, in the flotation step has succeeded in separating 50% of sulfur, which is an essential component of sulphides. It has also been determined the presence of potentially toxic elements: mercury 0.09 mg/kg, cadmium <0.01%, 0.07% arsenic, antimony 0.03% and 0.01% lead From the environmental point of view, the chemical analysis of mining waste has determined the presence of heavy metals as are mercury, arsenic, antimony and lead, and on the other hand static geochemical testing has classified residue in the area of uncertainty, which involves making other studies. The metallurgical indices obtained encourage the proposal to implement a pilot plant for two years retreating the tailings after final grinding to -100#, while the construction of the tailings dam starts. After two years, it is recommended to extend a complete plant for 8 years and 1200 TPD is recommended. We have obtained the following economic-financial indices: estimated capital cost $US 9'840,908.00; net present value $U.S. 667,323.17; internal rate of return 15.28%; B/C ratio of 1.60; capital recovery period of six years, duration of the Project ten years. These results encourage carrying out the project.en
dc.identifier.urihttp://www.scielo.org.bo/scielo.php?script=sci_arttext&pid=S2519-53522016000100002&tlng=es
dc.identifier.urihttps://andeanlibrary.org/handle/123456789/91948
dc.language.isoes
dc.publisherREV. MAMYM
dc.relationhttp://www.scielo.org.bo/pdf/mamym/n1/n1_a02.pdf
dc.relation.ispartofREV. MAMYM
dc.sourceSciELO Bolivia
dc.subjectResiduos mineros
dc.subjectRetratamiento
dc.subjectCasiterita
dc.subjectColas-arenas
dc.subjectConcentración centrífuga
dc.subjectMinería del estaño
dc.subjectElementos potencialmente tóxicos
dc.subjectMining waste
dc.subjectRetreatment
dc.subjectCassiterite
dc.subjectTails-sands
dc.subjectCentrifugal concentration
dc.subjectTin mining
dc.subjectPotentially toxic element
dc.titleRetratamiento de colas finales planta c-4 de la mina de catavi (Potosi-Bolivia); una propuesta técnica económica y ambiental
dc.title.alternativeRetreatment of final tails from c-4 mining plant of catavi (Potosí-Bolivia); an economical technical and enviromental proposal
dc.typeArtículo Científico Publicado